Drilling Through Rock in the Wetlands

Client Name
Confidential
Project Location
Ashtabula, Ohio
Completion Date
July 2022
Solutions Provided
HDD, Collaborative Delivery, Project Management, Engineering
Scope

Gabe’s placed 1,394 feet of 12” steel pipe in rock — all under delineated wetlands. Their HDD crew worked through Ashtabula’s hard rock from the initial pilot bore to a final 18” ream.

Challenges

Because of this site’s protected wetland status, the client was very concerned about inadvertent release of drilling fluid. Gabe’s in-house engineering team performed a hydrofracture analysis and concluded that a deeper path would successfully mitigate hydraulic fracture risk. Their engineers worked directly with the client to modify the design. Gabe’s contributions addressed the client’s concerns and accelerated project completion.

Our Impact

1.3K+

Feet Drilled Through Rock

12”

Steel Pipe Placed Under Wetland

18”

Ream in Solid Rock